Lumi / Construction & MEP

Hand off the tender pack,get back the lines to review before you bid.

The agent compares the bill of quantities (BOQ), specifications and supplier quotes, collecting unpriced lines and spec gaps. Estimators and MEP engineers decide the bid.

AI-generated editorial illustration of working materials for Construction & MEP.
Tender and BOQ review preparation
Current scope

The agent for this industry is a proposal: product access is not open, and feasibility is confirmed before a pilot. BI is already deployed with customers.

Watch the agent work · 26 seconds

One run, from hand-off to approval.

Thursday, 4:00 pm. The bid is due in 2 days. Which BOQ lines are still open?

IllustrativeIllustration with synthetic data, matching the scenarios below and the CSV file. Not customer data.
Read the video as text
  1. Thursday, 4:00 pm. The bid is due in 2 days. Which BOQ lines are still open?
  2. Lumi Agent · BOQ review · MEP package (Read-only · approved folder): Read MEP bill of quantities rev.3, 64 lines; Read Specification and 2 supplier quotes, Rev.2 for comparison; Matched Quantities, specs and unit prices, 61 lines priced to spec; Flagged M-118 unpriced, 4×70 cable instead of 4×95, 3 lines to review; Did not Set the bid price or declare equivalence, Outside granted access.
  3. BOQ review · MEP package: Priced lines 61 / 64, No quote 1, For the engineer 2. M-118: Cable tray 300×100, 240 m: in no quote (No price); C-031: Cable 4×95 mm²: supplier B offers 4×70 (Spec gap); E-042: LED panel: rev.2 180 sets, rev.3 156 (Revision).
  4. Request a quote for M-118 and ask supplier B to re-quote the 4×95 mm² cable. Sources: BOQ rev.3 has M-118, 240 m; Specification: 4×95 mm² cable; Supplier B offers 4×70 mm². Approved · MEP engineer. The agent drafts two quote requests for the estimators to send. The bid price is not set.
  5. Hand off the tender pack. Get back the open lines. Your engineers make the call.

Never let a missed line vanish into the bid total.

Three parts of tender review the agent could take on.

Find unquoted items

Link BOQ lines to supplier quotes and list items that have not been priced.

Expose specification gaps

Put requirements beside supplier details, with references an engineer can inspect.

Establish authoritative revisions

Record document versions and dates; ask for confirmation when they conflict.

Every pilot measures preparation, review, correction and support time. There are no savings figures to publish in advance.

Tender and BOQ review preparation

Say what needs to be done; the agent works through the four steps below and stops where your decision is needed. Sample files, matching rules and the reviewer are agreed before a pilot.

Explore the proposed steps
  1. You choose what the agent reads

    BOQs, technical specifications, drawings, supplier quotations, and authorized document revisions.

  2. The agent prepares the draft

    Organizes information into agreed templates, keeps identifiers intact and cites a source for every line.

  3. The agent checks against your rules

    Account for BOQ lines, cite clauses and versions, and check units, totals, and missing items.

  4. You approve before the next step

    The agent lays out every mismatch with its source; you decide before anything happens downstream.

Proposed workflow

What is waiting for you when you come back?

The packet the agent is planned to hand back after each run. File formats are agreed before work begins.

Explore the planned deliverables

Proposed deliverables

  1. BOQ review

    BOQ lines, corresponding quotations, and items without a matching source.

  2. Requirements comparison

    Requirements, supplier details, and differences for engineering review.

  3. Clarification questions

    Questions about items, revisions, or specifications that remain unresolved.

  4. Source references

    Cite authorized files, locations and versions.

  5. Checks and review decisions

    Record failures, unverified items and decisions needed.

Estimators and engineers finalize the bid.

A comparison table points reviewers to the right questions. The responsible team still interprets documents and confirms quantities, engineering choices, and bid prices.

  • You decide what the agent reads
  • Keep your existing systems
  • The agent asks before acting

No design approval, engineering compliance certification, final bid pricing, or tender submission.

Hand off a first task

Pick a recent set of documents. Together we see which part is worth handing to the agent and which should stay with your specialists.

Illustrative working materials for Construction & MEP.
  1. Review a recent job

    Measure preparation and review effort, identify bottlenecks, and document the recurring cycle.

  2. Agree implementation scope

    Confirm data permissions, reviewers, output formats, acceptance criteria, and clear costs.

  3. Test safely with synthetic data

    Check workflow handling on realistic synthetic cases before requesting access to actual records.

  4. Measure results and hand over

    Account for all support effort, compare against the current baseline, and decide together on next steps.

Frequently asked questions

Is the agent for this industry ready to use?

Not yet. It is a proposed scope to discuss your needs; feasibility is confirmed before any real records are used. BI is already deployed with customers and can start on its own.

Will the agent make decisions or change our systems?

No design approval, engineering compliance certification, final bid pricing, or tender submission.

What preparation is needed before we speak?

BOQs, technical specifications, drawings, supplier quotations, and authorized document revisions. Please do not send confidential documents through the contact form.

Does submitting an enquiry incur any cost?

No. The form simply registers your interest so we can connect. Scope, pricing, and deployment criteria are agreed transparently before any work starts.

Which line in your last bid required the most cross-checking?

Describe the result you need, not the steps: your last run, how often it recurs, where it takes the most effort. No real files needed yet.

Discuss your workflow

Discuss your workflow: Construction & MEP

Leave your details and a brief description; no files needed yet.

Describe the task, frequency, and main bottleneck. Do not enter personal data, confidential files, or customer information.

Your contact details and message are sent to Lumi’s internal Discord channel to handle this enquiry. Please do not include payment details or confidential documents.